
The first beautiful and modern pool, built on the Bulgarian Black Sea coast after 1989.The pool was


The employer is Municipality Pomorie. The pipeline was done with HDPE and PVC pipes Ø315 and horizon


This stage was completed with AC pipes with socket connections. For the drainage of the central alle


The employer was Bourgas Municipality, the project included the construction of a water reservoir an
