language BGENDERU

Emergency repair of the main water-supply pipeline Kamchia-Yasna polyana

Reconstruction in two stages of the existing DN900 steel main water-supply pipeline with 500m of DN700 cast iron pipes. The excavation works were performed in conditions of high underground water level and using steel trench shoring.